img

DCM-2316

The National Instruments DCM-2316 is a Direct Injector Control and Measurement Device with 16 channels supporting up to 8 piezoelectric or 16 solenoid injectors, high-resolution engine tracking, and advanced waveform generation, operating at

In Stock | Ships Today

img

    Description

    The DCM-2316 Direct Injector Control and Measurement Device, with part number 784570-01, is a sophisticated product from National Instruments that features 16 channels capable of high-resolution engine position tracking and supports up to 8 piezoelectric or 16 solenoid direct injectors. This device is designed to operate at voltages up to 250 V and requires a voltage dissipation time of 2 minutes after being powered off for safety.

    Users must adhere to safety precautions by not touching connector pins or injector terminals when the device is powered on to prevent shock. The DCM-2316 boasts advanced waveform generation and triggering capabilities, enabling precise control of fuel systems through its LabVIEW reconfigurable I/O (RIO) architecture. While the maximum power consumption is contingent on high-stress applications, it is crucial to note that the device is not recommended for measurements in Measurement Categories II, III, or IV.

    Feature Specification
    Manufacturer National Instruments
    Product Name DCM-2316 Direct Injector Control and Measurement Device
    Part Number 784570-01
    Channels 16
    Engine Position Tracking High-Resolution
    Injector Type Supported Up to 8 piezoelectric or 16 solenoid direct injectors
    Operating Voltage Up to 250 V
    Voltage Dissipation Time 2 minutes after power-off
    Safety Precautions Avoid touching connector pins or injector terminals when powered ON
    Waveform Generation and Triggering Advanced Features
    Control Architecture LabVIEW reconfigurable I/O (RIO)
    Maximum Power Consumption Based on high-stress applications
    Measurement Categories Not recommended for Categories II, III, or IV

    Question 1: What are the specific safety measures one must follow when using the DCM-2316 Direct Injector Control and Measurement Device to avoid electrical shock?
    Answer 1: When using the DCM-2316 Direct Injector Control and Measurement Device, one must avoid touching connector pins or injector terminals while the device is powered on to prevent electrical shock, and ensure a voltage dissipation time of 2 minutes after powering off for safety.

    Question 2: What precautions should users take when operating the DCM-2316 Direct Injector Control and Measurement Device to ensure safety and prevent electric shock?
    Answer 2: Users should ensure not to touch the connector pins or injector terminals of the DCM-2316 Direct Injector Control and Measurement Device when it is powered on, and they should also allow a voltage dissipation time of 2 minutes after powering the device off for safety.

    Question 3: What is the required voltage dissipation time for safety after powering off the DCM-2316 Direct Injector Control and Measurement Device, and what safety precautions must users observe when the device is operational?
    Answer 3: Users should ensure safety and prevent electric shock while operating the DCM-2316 Direct Injector Control and Measurement Device by not touching the connector pins or injector terminals when the device is powered on.

    Question 4: What safety procedures should users follow when using the DCM-2316 Direct Injector Control and Measurement Device to avoid the risk of electric shock?
    Answer 4: When operating the DCM-2316 Direct Injector Control and Measurement Device, users must follow safety procedures such as not touching the connector pins or injector terminals while the device is powered on to avoid electric shock, and allowing a voltage dissipation time of 2 minutes after powering off the device for safety.

    Question 5: What are the safety procedures that users must follow when operating the DCM-2316 Direct Injector Control and Measurement Device to avoid electric shock?
    Answer 5: The required voltage dissipation time for safety after powering off the DCM-2316 Direct Injector Control and Measurement Device is 2 minutes, and users must observe the safety precaution of not touching the connector pins or injector terminals when the device is operational to prevent the risk of electric shock.